top of page
Andrew Ayers
CHURCH @ THE SPRINGS
VILLAGE CAMPUS INSTALL
Andrew was tasked with redesigning a mulit-site campus while on staff at Church @ The Springs. The campus was at capacity, and needed to reconfigure the space to allow additional people to hear the Gospel each week.
Andrew and a small production team redesigned the space and reopened the campus between weekends, allowing the campus to stay operational.
bottom of page